Donna Hinde, and Wai Ying Di Giorgio, The Planning Partnership provided a presentation on the Beaverton Waterfront Plan which included:
- community engagement
- design workshop
- 3 workshop table groups created 3 specific design directions
- options for the boathouses
- online survey to receive input on the 3 workshop designs in order to identify the most preferred components
- harbour pier inspection report
- harbour washroom facility
- develop the harbour as a destination with residential and commercial/retail uses
- create a promenade to the pier adjacent to the playground
- transform a portion of parking lot at the boat launch for a pedestrian space at the water's edge
- Beaverton fairgrounds
- addition of tennis, basketball, pickleball courts
- bandshell
- connection to the harbour via a walkway
- Simcoe Street railway parcels
- Mill Gateway Park
- add a pedestrian sidewalk
- Downtown
- create a 'river walk' along the river with seating nodes
- enhanced gateway to downtown
- enhanced south side walkway to parking off Bay Street
- phasing
- next steps - final report with a plan for action